Make a material list for a garden layout

Separate area, volume, and run length before comparing a garden order.

By CalcForge ·

Method

Record soil and mulch in litres, paving in area, and edging in running length. List the measurements and chosen depth beside each line.

Worked example

An 8 m² bed receiving 50 mm of cover needs 400 L; a straight edge along its 4 m side needs 4 m of edging.

What to check

Avoid adding unlike quantities. Each line should end in the supplier’s sale unit.

Use the material calculator when the product is sold by area per pack.

Open the material pack calculator ↗